Two changes: 1. INDEX.md (new, generated). Workspace-level index that lists every package grouped by UAPF level (L0/L1/L2/L3/L4) for navigation. Per UAPF specification §01-concepts.md, levels are an aggregation and governance scope only and MUST NOT be used to imply modeling semantics; per §04-folder-structure.md the SHOULD-recommended on-disk layout is enterprise/ + domains/ + processes/ regardless of level. INDEX.md is therefore a level-grouped *view* over the spec-conformant on-disk layout, not an alternative layout. Generated by tools/build-index/build_index.py (new), which walks the workspace manifests and emits INDEX.md from current state. 2. docs/methodology.md updated to document the §07 auto-layout DI as a known deliberate non-conformance. §07-package-format.md requires authored DI (from a conforming OMG modeler) and explicitly forbids automatic layout generation as a substitute. The DI in the five .bpmn files in this workspace is auto-generated by tools/register-transcoder/bpmn_di.py and is therefore non-conformant under §07. It is kept for the POC so artefacts preview visually; the conformant path is to re-author each .bpmn in Camunda Modeler or bpmn-js Studio and recommit, which emits authored DI. New *Known non-conformances* section in methodology.md cites §07 verbatim and explains this rationale. The Pass-1 transcoder section and Final-validation-pass section are softened to call out that the DI is auto-generated. uapf-cli validate green on all 13 packages (L1 domains/gramatvediba, L2 fg1-fg6, L3 fg3-2/3/6, L4 fg3-1/4/5).
2.7 KiB
2.7 KiB
vk-gramatvediba workspace index
This index lists every package in the workspace grouped by UAPF
level (L0–L4). Per UAPF specification §01-concepts.md, levels
are an aggregation and governance scope only; per
§04-folder-structure.md the SHOULD-recommended workspace layout
is enterprise/, domains/, processes/ regardless of level.
This file is therefore a level-grouped view over a
spec-conformant on-disk layout, not an alternative layout.
Regenerate with python3 tools/build-index/build_index.py.
Total packages: 14 (L0: 1, L1: 1, L2: 6, L3: 3, L4: 3).
L0 — Enterprise process collection index
| Package | Path | Description |
|---|---|---|
vk.gramatvediba |
enterprise/enterprise.yaml |
Valsts Kase — Grāmatvedības uzskaite |
L1 — Domain process collections
| Package | Path | Includes | Description |
|---|---|---|---|
vk.gramatvediba.domain |
domains/gramatvediba/ |
../../processes/fg1, ../../processes/fg2, ../../processes/fg3, ../../processes/fg4, ../../processes/fg5, ../../processes/fg6 |
Grāmatvedības uzskaite — accounting domain |
L2 — End-to-end business processes
| Package | Path | Includes | Description |
|---|---|---|---|
vk.gramatvediba.fg1 |
processes/fg1/ |
(none) | FG1 — Ilgtermiņa nefinanšu aktīvu un krājumu uzskaite |
vk.gramatvediba.fg2 |
processes/fg2/ |
(none) | FG2 — Finanšu aktīvu uzskaite |
vk.gramatvediba.fg3 |
processes/fg3/ |
../fg3-1, ../fg3-2, ../fg3-3, ../fg3-4, ../fg3-5, ../fg3-6 |
FG3 — Saistību un izdevumu uzskaite |
vk.gramatvediba.fg4 |
processes/fg4/ |
(none) | FG4 — Saistību par atlīdzību uzskaite |
vk.gramatvediba.fg5 |
processes/fg5/ |
(none) | FG5 — Prasību un ieņēmumu uzskaite |
vk.gramatvediba.fg6 |
processes/fg6/ |
(none) | FG6 — Pārskatu sagatavošana publiskošanai |
L3 — Composed subprocesses / variants
| Package | Path | Includes | Description |
|---|---|---|---|
vk.gramatvediba.fg3-2 |
processes/fg3-2/ |
(none) | FG3-2 — Iepirkuma līguma darbības izbeigšana |
vk.gramatvediba.fg3-3 |
processes/fg3-3/ |
(none) | FG3-3 — Klienta datu pārvaldība |
vk.gramatvediba.fg3-6 |
processes/fg3-6/ |
(none) | FG3-6 — Kopsavilkuma grāmatošana |
L4 — Atomic executable processes
| Package | Path | Cornerstones | Description |
|---|---|---|---|
vk.gramatvediba.fg3-1 |
processes/fg3-1/ |
bpmn, dmn, resources | FG3-1 — Rēķina/kredītrēķina saņemšana par precēm/pakalpojumiem |
vk.gramatvediba.fg3-4 |
processes/fg3-4/ |
bpmn, dmn, resources | FG3-4 — Saimnieciskā norēķina veikšana |
vk.gramatvediba.fg3-5 |
processes/fg3-5/ |
bpmn, dmn, resources | FG3-5 — Komandējuma norēķina veikšana |